Project
The construction process may cause some disruption due to noise and short interruptions of service as offices are being moved.
Gordon Library is undergoing the first phase of a renovation during the next few months. When the project is complete, the Technology for Teaching and Learning (TTL) group of the ATC and CCC Technology Help Desk group will join staff already in the library to create an Information Commons that will consolidate a number of student, faculty, and staff services. A phased approach will be taken for the construction and relocation of services and offices.
Goals
The goals of the project are to:
- Create engaging and flexible spaces within the Information Commons
- Dynamically link multimedia and technology to research and teaching
- Cultivate innovation by changing the social and technical climate in the facility
Changes
- The TTL and Help Desk staffs will be located on the second (entry level) floor to the right of the lobby.
- Expanded group collaboration space with adjacent technology and research support services will be created on the same level taking space vacated by the Collections Management Offices.
- The Archives and Special Collections department will relocate to the ground floor as will the Digital Reformatting Center and the Preservation Department. The Gladwin Gallery will also move to the ground floor.
- Library Administration, Systems, and Collection Management offices will move to the third floor in the space vacated by the Archives and Special Collections.
- Computers and the configuration of academic software currently in the Movie Lab and Anderson Labs will be relocated to different areas of the library.
Timeline
As changes occur, information on the project will be posted here. The timeline for the project is outlined below.
April and May 2009
- Create a small space for networking equipment on the first floor
- Open the corridor for the Gladwin Gallery on the ground floor
- Renovate ground floor spaces for Archives Reading Room, Office, Storage, and Preservation
- Move Archives and Special Collections from third floor to ground floor
- Replace library roof
June and July 2009
- Move Library Administration, Systems, and Collections Management to third floor
- Relocate ATC TTL staff to Gordon Library
- Relocate library staff room to GL 206
- Redistribute computers and academic software throughout the library
Spring/Summer 2010
- Remove wall on second floor to expand collaborative work spaces and enhanced service areas
- Install new partition to create technology Help Desk/Call Center
- Relocate CCC Help Desk staff to Gordon Library
- Install carpet and suspended ceiling on ground floor adjacent to Gladwin Gallery
- Create a café on the entry level of the library building
Questions?