
Project Type MQP Submission date 2008-02-29 Authors Christopher N Andrews, CE Ryan J Bourque, CE Lee M Pappas, CE Jacob E Russell, CE URN E-project-022908-095611 Title Line of Balance Analysis of the New WPI Residence Hall Advisors Salazar, Guillermo F., CE Tao, Mingjiang, CE Jayachandran, Paramasivam, CE Availability unrestricted Abstract
This project proposes a scheduling approach to coordinate the final stage of activities to be conducted in the construction of a new WPI residence hall. Based on the traditional schedule generated by the Critical Path Method, the proposed approach uses the Line of Balance method to coordinate in more detail subcontractors performing repetitive operations within the building. The project also presents a structural design for a section of the building foundation to support lateral loading during construction.
Files C08_Line_of_Balance_Final_Paper.pdf Line_of_Balance_Database.xls
Browse by Author | Browse by Department | Search all available E-projects
Questions? Email project-questions@wpi.edu