    TitleSustainable Design of Belmont Street/Route 9 Bridge
    Advisor
  • Albano, Leonard D., CE
  • Availability unrestricted

    Abstract

    Based on inspection reports provided by MassHighway, the Belmont Street/Route 9 Bridge has three bridge components deemed deficient . The deck slab, girders, and columns were re-designed using AASHTO specifications and LRFD design. Additionally, sustainable bridge design aspects were examined including alternative building materials, maintenance protection, stormwater management, and transportation and urban planning. Lastly, a life-cycle cost analysis considering the re-designed bridge components and maintenance was conducted and a sustainable bridge guideline for future bridge design projects was created.

    Files
  • MQP_Final_Draft.pdf

  • Browse by Author | Browse by Department | Search all available E-projects

    [WPI] [Library] [Home] [Top]

    Questions? Email project-questions@wpi.edu
    Maintained by webmaster@wpi.edu