Project Type MQP Submission date 2007-03-12 Authors Peter W Bellino, pbellino@WPI.EDU, CE Mehmet F Hergunsel, CE URN E-project-031207-145450 Sponsor Consigli Construction Title GATEWAY PARK PROJECT: CEMENTITIOUS UNDERLAYMENT & INFORMATION EXCHANGE Advisors Salazar, Guillermo F., CE Albano, Leonard D., CE Availability unrestricted Abstract
Two aspects of the construction of the Gateway Park Project were studied: the
cracking of the cementitious underlayment of the floors at 68 Prescott Street and
information exchange between owners and construction managers. An investigation into
the behavior of timber/concrete floors was conducted by testing a composite and noncomposite
system, as well as performing a cost analysis. Information exchange was
evaluated through use of surveys and meeting checklists.