Worcester Polytechnic Institute Electronic Projects Collection

Title page for E-project-042909-095347


Project TypeMQP
Submission date2009-04-29
Authors
  • Jeffrey Brendan Burek, MGE
  • Ruth DeMott, Ms., ruth09@WPI.EDU, IE
  • Emalee C Drake, IE
  • Karyn Susan Gottardi, IE
  • URNE-project-042909-095347
    SponsorBose Corporation
    TitleThe Final Line
    Advisor
  • Johnson, Sharon, MG
  • Availability unrestricted

    Abstract

    This project was prepared for the Park Place Manufacturing plant of the Bose Corporation in Framingham, MA to design and analyze a manufacturing line, known as the Final Line. An analysis of the current state of the line was conducted, alternative designs were presented and an optimal layout was selected for implementation. The goal in designing the new Final Line was to incorporate lean principles leading to a more efficient manufacturing cell.

    Files
  • Final_Line_Redactedv2_Scanned.pdf

    There is one file which has been withheld at the advisor's request.


  • Browse by Author | Browse by Department | Search all available E-projects

    [WPI] [Library] [Home] [Top]

    Questions? Email project-questions@wpi.edu
    Maintained by webmaster@wpi.edu