Project Type MQP Submission date 2009-04-29 Authors Jeffrey Brendan Burek, MGE Ruth DeMott, Ms., ruth09@WPI.EDU, IE Emalee C Drake, IE Karyn Susan Gottardi, IE URN E-project-042909-095347 Sponsor Bose Corporation Title The Final Line Advisor Johnson, Sharon, MG Availability unrestricted Abstract
This project was prepared for the Park Place Manufacturing plant of the Bose Corporation in Framingham, MA to design and analyze a manufacturing line, known as the Final Line. An analysis of the current state of the line was conducted, alternative designs were presented and an optimal layout was selected for implementation. The goal in designing the new Final Line was to incorporate lean principles leading to a more efficient manufacturing cell.
Files Final_Line_Redactedv2_Scanned.pdf There is one file which has been withheld at the advisor's request.