
Project Type IQP Submission date 2005-04-28 Authors Ryan T Casey, ME Brian P Day, AE Denise M Donoghue, CM Andrew L Papia, ECE URN E-project-042805-135720 Division Energy and Resources Center London, England Sponsor London Borough of Merton Title Distribution Route Assessment for a Combined Heat and Power System Advisors Salazar, Guillermo F., CE FitzPatrick, Malcolm, CE Availability unrestricted Abstract
The London Borough of Merton (LBM) has determined that a pyrolysis combined heat and power (CHP) plant has the potential to supply local sites with inexpensive heating and electricity while eliminating waste and reducing overall CO2 emissions. The objective of this project was to investigate the most effective route for heat and power distribution from the Willow Lane Industrial Estate to the Canons Leisure Centre based on economic, technical, environmental, and social considerations. This route assessment will guide the LBM in their implementation of a CHP distribution network.
Files FinalIQPReportMertonCHP.pdf
Browse by Author | Browse by Department | Search all available E-projects
Questions? Email project-questions@wpi.edu